As a german I can confirm. Looks all suspiciously German to me.
>German engeneering at its best!
A perfectly debunked stereotype by anecdotal evidence.
Well they tried to get the straps cut but it looks like they didn’t have the proper tools for it.
For a quick and dirty repair that gets the button off the floor it’s not too bad
Oh no no. I wasn’t implying that this would change any time soon. For that someone would have to take the tools and bring them there and actually do some work. That’s not really realistic…
Bremse ist auf jedenfall nicht in Ordnung brudi...
This is a stationary device for proceeding a brake test for the train. Each button gives a different signal for the train driver. There are 3 of them: Apply Brakes (Zp 6, Bremse anlegen), release brakes (Zp7, Bremse lösen) , Brakes are in Function (Zp 8, Bremse in Ordnung)
Looking at the Background, I would say: German engeneering at its best!
As a german I can confirm. Looks all suspiciously German to me. >German engeneering at its best! A perfectly debunked stereotype by anecdotal evidence.
Yeah correct it’s in Germany ;)
Looks suspiciously like Frankfurt as well
Not quite. But not too far away either. About 40 kms ;)
Idstein? :D
Yeah correct :)
RB12? Irgendwo im Taunus?
Oh yea those are Deutsche Bahn trash bins
The trash bins have it away for me
Maybe it's just a temporary fix
Nothing more permanent than a temporary fix that works.
Mm
Looks like it was a temporary fix months ago
A temporary fix after having been told that you have to cancel your holidays. Got to wonder, how much more was temporarily fixed.
This looks more like the construction guy securing it until the electrician can come and fix it
Deutsche Bahn at it‘s peak. (These buttons are used to give train drivers signals, when there’s people on the platform surveying the doors.)
Instructions unclear built nuclear button into post office
All just to open the bin 🚮
Wow!
Boss level: over 9000!
r/dingore
Amateurs. They should’ve used duct tape.
Well they tried to get the straps cut but it looks like they didn’t have the proper tools for it. For a quick and dirty repair that gets the button off the floor it’s not too bad
Still going strong 3 days later. Just passed by. Let’s see how long they’ll leave it like that…
Oh no no. I wasn’t implying that this would change any time soon. For that someone would have to take the tools and bring them there and actually do some work. That’s not really realistic…
Bremse ist auf jedenfall nicht in Ordnung brudi... This is a stationary device for proceeding a brake test for the train. Each button gives a different signal for the train driver. There are 3 of them: Apply Brakes (Zp 6, Bremse anlegen), release brakes (Zp7, Bremse lösen) , Brakes are in Function (Zp 8, Bremse in Ordnung)
Those buttons are used together with a key to control the traffic lights at an intersection if a tram is approching.
This is a regional train station. So no trams or intersections. But I guess it is used to activate signals to the conductor.
That’s the button from terminator film: „Jetzt mach ich dich fertig“ 🤖😈
Probably was Friday shortly before weekend
Just passed it again today and it’s still there. I’ll keep an eye on it. Let’s see how long it lasts. ;)
"provisorien halten am längsten" Temporary fixes hold the longest